|
|
#加纳 #西非 #非洲
地方政府、酋长与宗教事务部部长 Mr Ahmed Ibrahim 宣布,计划将垃圾中转装载站正规化,并将三轮车垃圾收集人员纳入 Ghana 的长期环境卫生框架中。\n\n他表示,该举措将为全国范围内的垃圾管理提供更加全面和可持续的方法。\n\nMr Ibrahim 是于周一在视察位于 Accra 的 Zoomlion Integrated Recycling and Compost Plant (IRECOP) 时宣布这一消息的。该厂目前承担 Jamestown 地区垃圾中转站的功能。\n\n关注我们的 WhatsApp | LinkedIn 获取最新头条新闻\n\n他透露,在政府采取干预措施清理近期全国卫生日活动产生的大量垃圾后,Greater Accra Region 指定的六个垃圾中转站中,已有五个恢复满负荷运转。\n\n他表示,根据总统 President John Dramani Mahama 的指示,位于 Abokobi、Teshie、Achimota、Ashaiman 和 Jamestown 的中转设施已重新开放,以加快垃圾清运速度,防止暴发潜在的公共卫生危机。\n\nMr Ibrahim 解释说,作为紧急措施的一部分,中转站门前的垃圾称重计费等日常行政程序已被暂时中止,以确保社区垃圾能够快速清运。\n\n尽管取得了上述进展,但他同时指出,位于 Malam 的中转站因缺乏进场道路,目前仍处于停运状态。
中文导读
在WhatsApp | LinkedIn上关注我们,获取最新头条新闻

原文原文 / Original TextThe Minister of Local Government, Chieftaincy and Religious Affairs, Mr Ahmed Ibrahim, has announced plans to formalise waste transfer loading stations and integrate tricycle waste collectors into Ghana's long-term sanitation framework.
He said the initiative would provide a more comprehensive and sustainable approach to waste management across the country.
Mr Ibrahim made this known during a working visit to the Zoomlion Integrated Recycling and Compost Plant (IRECOP) in Accra on Monday, which is currently serving as a transfer station at Jamestown.
Follow us on WhatsApp | LinkedIn for the latest headlines
He disclosed that five out of the six designated waste transfer stations in the Greater Accra Region were now operating at full capacity, following government intervention to clear the large volumes of refuse generated after the recent National Sanitation Day exercise.
The facilities at Abokobi, Teshie, Achimota, Ashaiman and Jamestown, he said, were reopened on the directive of President John Dramani Mahama to speed up waste evacuation and avert a potential public health crisis.
Mr Ibrahim explained that as part of emergency measures, routine administrative procedures, including waste weighing charges at transfer station gates, had been temporarily suspended to ensure the swift movement of refuse from communities.
Despite the progress, he noted that the Malam transfer station remained non-operational due to the absence of an access road.
本文为英文资讯,中文内容由机器翻译生成,仅供参考。详情请阅读文末原文。
—— 资讯转载说明 ——
本文由非洲论坛根据公开信息整理,供中国读者查阅,不代表本站立场。
来源:AllAfrica (https://allafrica.com/)
原文链接:https://allafrica.com/stories/202608060348.html
转载请遵守原发布方版权与引用规定。 |
|